Executed Projects

GeoTools Responsibility: Fixture Design, Robot cell simulation and design, Assembly, Robot Programming and Tryouts

Pre Engineering: Feasibility Study of Body Side LH and RH for proving cycle time of 140 seconds.

    Robotic Line design:
  • Robotic Line design:
  • Robot and Gun selections
  • Robot reach study
  • Tool validation
  • Path Planning
  • Cycle time validation
  • Dual safety check (DCS )
  • Offline programming (RCS&OLP)
Total No of Robots: 32 (KUKA)
RCS module: KUKA KRC 8.3 r14
Total no of Spots: 968
Sealing: 6250mm

Software: Process Simulate and Catia V5



Pre Engineering: Feasibility Study of Main Framing Line for proving cycle time of XXX seconds.

    Robotic Line design:
  • Layout Planning
  • Robot and Gun selections
  • Robot reach study
  • Tool validation
  • Path Planning
  • Cycle time validation
  • Dual safety check (DCS )
Total No of Robots: 20 (Fanuc)
Total no of Spots: XXX
Sealing: 0 mm


Software: Process Simulate and Catia V5